Project sourcing guide

Source Spanish hospitality furniture around the specification, not the catalogue.

Contract furniture decisions connect design intent with performance, repeatability, approvals and a delivery sequence that works on site.

By Find it in Spain · Last reviewed:

01

Issue a usable manufacturer brief

Provide drawings, quantities by type, materials, finishes, performance standards, destination, program and approval process. Identify whether the supplier is expected to engineer, manufacture, install or only price to a completed design.

02

Screen for project capability

Ask about relevant contract work, internal versus subcontracted production, engineering resources, quality control, capacity, prototyping and change management. Similar aesthetics do not prove similar delivery capability.

03

Control samples and approvals

Use finish samples, material submissions, shop drawings, prototypes or room mock-ups according to risk. Record approvals and deviations so production does not rely on informal messages.

04

Plan the final mile early

Packaging, consolidation, inspection, shipping sequence, customs, site access, storage and installation responsibilities should be assigned before production is complete.

Requirements vary by product and destination and should be verified before an order is finalized.